TOPFIBRA - Effective, Continuous Filament Winding Lines
  • Home
  • EFW® Technology
  • Effective GRP Production Plant
  • Our Services
    • Effective GRP Production Plant
    • Upgrade Existing CFW Production Line
    • Improve GRP Plant Performance
    • Maximize GRP Line Availability
  • GRP Pipe Solutions
  • Gallery
    • Pictures
    • Videos
  • About Us
    • Our Commitment
    • Experience and Expertise in the Industry
    • Sustainability
    • News
    • Blog
    • Magazines
    • Testimonials
  • Contact Us
  • FAQ
  • Customers Area
    • Corporate Area
    • EFW® Tech Center
Select Page
  • Home
  • EFW® Technology
  • Effective GRP Production Plant
  • Our Services
    • Effective GRP Production Plant
    • Upgrade Existing CFW Production Line
    • Improve GRP Plant Performance
    • Maximize GRP Line Availability
  • GRP Pipe Solutions
  • Gallery
    • Pictures
    • Videos
  • About Us
    • Our Commitment
    • Experience and Expertise in the Industry
    • Sustainability
    • News
    • Blog
    • Magazines
    • Testimonials
  • Contact Us
  • FAQ
  • Customers Area
    • Corporate Area
    • EFW® Tech Center
Effective Filament Winding® Method EXPLAINED

Effective Filament Winding® Method EXPLAINED

by devtopfibra | Nov 5, 2020 | News and Events

The EFW® method is more than just a better way to design a complete manufacturing plant and design, produce and install GRP pipes. Essentially, it’s a »school of thought«. You can now read all about the EFW® method in the NOVEMBER issue of Tube and Pipe...
Tube Products International Interviewed our CEO

Tube Products International Interviewed our CEO

by devtopfibra | Sep 21, 2020 | News and Events

Interview with TOPFIBRA CEO, Mauricio Facchinetti The interview with TOPFIBRA CEO, Mauricio Facchinetti can also be read in the last edition of Tube Products International. Check out what TOPFIBRA does, what our mission is, and how we effectively contribute to the GRP...
We Are Almost at The End With The Shipment of a E-CFW Line

We Are Almost at The End With The Shipment of a E-CFW Line

by devtopfibra | Aug 20, 2020 | News and Events

We are almost at the end! One of the last shipments before the final assembly. Two more containers separate us to start assembling the Effective Filament Winding Line (EFW Line). This time, TOPFIBRA is sending the Grinding and Cutting Machine Online. The machine has...
The Compaction Rollers Are Ready To Reach Their Destination

The Compaction Rollers Are Ready To Reach Their Destination

by devtopfibra | Aug 12, 2020 | News and Events

Shipment Completed! The Compaction Rollers Are Ready to Reach Their Destination. During the production of a GRP pipe, it is very important to remove the trapped air in the laminate, get a good resin distribution and a compact structure. On the winding machine, there...
New Hydrotester For Pipe Is On Its Way To Be Installed

New Hydrotester For Pipe Is On Its Way To Be Installed

by devtopfibra | Aug 5, 2020 | News and Events

Ready for Shipment! The New Hydrotester for Pipe Is on Its Way to Be Installed Extremely easy to install, our EFW® Hydrotester is capable of testing any pipe length, withstands more than 1.600 tons of thrust load, and is ready for testing 100% of all pipes produced,...
Another Shipping Container Is Loaded And Ready To Go

Another Shipping Container Is Loaded And Ready To Go

by devtopfibra | Jul 30, 2020 | News and Events

Another Shipping Container Is Loaded and Ready for the Final Customer Each device has been developed and tested for efficient operation through our Effective Filament Winding® Technology. Such a diagnostic approach is the only effective way to avoid all the potential...
Page 17 of 20« First«...10...1516171819...»Last »

More News

  • While other lines get tested for the first time in your plant, ours already ran as a complete system

    While other lines get tested for the first time in your plant, ours already ran as a complete system

    August 12, 2026
  • The one step most plants skip before installation – and regret later.

    The one step most plants skip before installation – and regret later.

    August 4, 2026
  • Topfibra is hiring: Mechatronic Engineer

    Topfibra is hiring: Mechatronic Engineer

    August 3, 2026
  • Efficiency isn’t tested once. It’s proven over time.

    Efficiency isn’t tested once. It’s proven over time.

    July 31, 2026

TOPFIBRA – a pioneer in
Effective Filament Winding® Technology

  • Follow
  • Follow
  • Follow

Areas

EFW® Technology
Effective GRP Production Plant
Upgrade Existing CFW Production Line
Improve GRP Plant Performance
Maximize GRP Line Availability

Company

About Us
Testimonials
News
Gallery

Corporate Zone

Corporate Areas
EFW® Technical Center
FAQ
Blog

Contact

+386 8200 1500
[email protected]

 

© 2018 - 2026 TOPFIBRA d.o.o. All Rights Reserved.

TOPFIBRA Sitemap

Privacy Notice

Cookies Notice