A New Order of EFW Steel Band is Ready for Shipment!

June 22, 2020 | News and Events

A New Order of EFW Steel Band is Ready for Shipment!

A Brand-New Order of Our EFW Steel Band is Ready for Shipment!

 

Thanks to our unique flattening and edge processing, with our EFW STEEL BAND, the risk of overlapping is drastically reduced and the durability is greatly increased, even for small diameter production.

Our customer will:

  • Lower GRP pipe manufacturing costs;
  • Reduce the downtimes;
  • Reduce scrap levels;
  • Obtain a better liner surface.

 

Final result? IMMEDIATE PROFIT BOOST!

Are you still producing without it?

More News

subscribe to our newsletter

RECEIVE VALUABLE INFORMATION AND GREAT INSIGHTS ON EFFECTIVE FILAMENT WINDING® GRP PIPE PRODUCTION.

FILL UP THE REQUIRED FIELDS BELOW AND SIGN UP