Our customer ALFEBOR is producing ND 3400 pipe 24 hours/day, 7 days/week nonstop and is getting the following results:
- Overall savings, compared with the initial estimation, equal to 5,2 %;
- Pipe technical specs higher than expected;
- Production progress: ahead of the schedule.
What does 5,2% savings mean?
If we calculate the average cost of raw materials, we are talking of more than 100.000 EUR/Month!
Congratulation to all ALFEBOR team for such impressive results using our EFW® equipment and technology.